With the construction of the infrastructure gallery at 1 Eylül Central Campus of Uşak University, it is aimed to carry out the infrastructure, electrical and mechanical connections of the existing and planned University’s buildings, and made them accessible during operation. The project includes 1,520 m long reinforced concrete gallery sized 3,00x2,70 m and 40 m of building connections.