The project aims to prevent the flow of wastewater from Silivri Basin to the Sea of Marmara. Wastewater lines connecting to Fenerdere and Boğluca creeks in Silivri district will be collected by right and left bank collectors to be built and will be transferred to Silivri Advanced Biological Wastewater Treatment Plant.
In the scope of the Project, Silivri Basin wastewater lines at the end of their lives will be renewed with 90,000 m reinforced concrete and 10,000 m of GRP pipes. In addition, 180 m horizontal drilling highway underpass and 360 m stream improvement will be made.